If you have an old fence with concrete footings, removing those footings is often the first and most important step before a new fence installation in Los Angeles. Left in place, broken or protruding footings can interfere with new post locations, create tripping hazards, and complicate permits or inspections. This guide explains the typical process, what affects price, realistic timelines for Los Angeles properties, and the right questions to ask your contractor so your replacement fence goes smoothly.

Why remove footings? Many older fences used concrete around posts that can remain after the wood or metal fence is taken out. These concrete remnants can be: partially buried stumps of concrete, full poured collars around posts, or linear strips of old footing. If you plan a new fence in the same line, leftover footings can prevent accurate post spacing, damage new post sleeves, and cause drainage or grading issues. Removing the footings ensures clean, level soil for new post holes, reduces future settling, and meets many permit or inspection requirements in Los Angeles.

What the job usually involves The crew will first perform a site walk to assess footing size, depth, and proximity to utilities, driveways, sidewalks, or irrigation. Common steps: 1) Safety and access: mark the work area, move vehicles or obstacles, and locate utilities (even if 811 markings were done earlier). If footings are next to public sidewalks or curbs, the crew will protect surfaces and may coordinate with the city for any sidewalk permits. 2) Remove visible fence material: panels, posts, rails, and gates are taken out and hauled away if removal service is included. 3) Excavation: small footings can be dug out by hand with shovels and pry bars. Larger footings or deep collars often require powered equipment like mini-excavators, jackhammers, or concrete saws. In Los Angeles neighborhoods with narrow access, crews may use compact breakers or bring footings to the surface in manageable pieces. 4) Breaking concrete: concrete pieces are broken into truck-sized chunks and loaded for haul-away or crushed onsite if specified. For deep or large footings, a hydraulic breaker or stump grinder may be used. 5) Backfill and compact: once concrete is removed, holes are backfilled with clean fill soil or gravel and compacted to prevent settling. For areas that will receive a new fence, contractors often leave stakes marking final post locations. 6) Cleanup and haul-away: debris, old nails, and concrete are removed and properly disposed of. Many contractors include disposal in the removal quote, but always confirm.

Factors that affect price and schedule Several site-specific issues change cost and timing: - Footing size and depth: full concrete collars and poured footings cost more to remove than shallow post bases. - Number of footings: removing a few footings is cheaper per-job than clearing dozens; volume affects labor and equipment needs. - Access and obstructions: tight backyards, gates, stairs, or steep slopes may require manual labor and more time. Los Angeles homes with alley access or unobstructed yards are easier to service. - Proximity to utilities and structures: footings near gas lines, electrical conduits, or under sidewalks can require careful excavation or coordination with utility companies and the city. - Equipment required: hand tools are cheapest, but a jackhammer, mini-excavator, or stump grinder increases cost and may need a permit for street parking or heavier equipment use. - Disposal and hauling: concrete disposal fees or recycling costs vary; some contractors include them, others list them as additional.

Typical timeline A small job (under 10 footings, shallow) often takes a single day. Medium jobs (10โ€“30 footings or deeper collars) typically take 1โ€“2 days. Large or complicated sites, jobs requiring saw-cutting under sidewalks, or work needing traffic control or city coordination can take several days and require scheduling windows with the city. Always ask for a start date range and a realistic completion estimate.

Permits, codes and inspections In Los Angeles, removing footings generally does not need a building permit, but replacing a fence often does, and inspectors sometimes require that old concrete that interferes with new post placement be removed. If footings extend into the public right-of-way, curb, or sidewalk, city approval may be needed before cutting or removing concrete. If your property is in a historic district, HOA, or has special slope restrictions, check local rules first.

What to ask a contractor before work begins Ask for a written estimate that breaks out: labor, equipment, disposal/recycling fees, and any potential add-ons (like saw-cutting sidewalks or utility coordination). Confirm whether the price includes hauling debris or if disposal is extra. Request assumptions about accessโ€”will they need driveway parking, a gate unlocked, or furniture and plant removal? Ask how they locate utilities and whether you should also call 811 before the crew arrives. Finally, get an estimated start date, number of crew members, and cleanup standards.

Common homeowner decisions and alternatives Sometimes homeowners choose partial removal: breaking and removing the top portion of the footing while leaving deeper concrete in place to save money. This can be acceptable if the remnants wonโ€™t interfere with new posts or drainage, but it increases the risk of future settling. Another option is to core-drill a new hole through an old footing for the new postโ€”possible for some metal post sleeves but rarely ideal for wood posts.

If youโ€™re planning a new fence in Los Angeles, clear communication about footing removal will avoid delays on install day. Truepost Fences Los Angeles offers site visits, itemized removal quotes, and coordinated scheduling with replacement fence installations. Learn more about our removal and haul-away service at /fence-removal-and-haul-away and prepare your property for a clean, secure new fence installation.